E3 CNC down after fire – follow updates here…
Wednesday Morning there was an incident on the E3, where a drill operation caugt fire in a 30mm MDF board. The fire was quickly brought under….
Wednesday Morning there was an incident on the E3, where a drill operation caugt fire in a 30mm MDF board. The fire was quickly brought under….
The spoilboards on the E3 was changed – and planned.– Thank to Alex 🙂
The three vacuum pumps for the CNCs had their yearly service on April 27th. They were found in good condition – but all blades inside the….
Spoilboards have been replaced after the circular incident, where a sliding tool caused damage to two of the three boards, beyond repair. The tool also hit….