The E3 CNC will, be taken out of production on May 26th from 900 til at least 1600.
Issues that will be investigated – and hopefully resolved:
- New Spoil Board
- Vacuum System Inspection
- SpoilBoard Inspection
- Dust Broom
- Pneumatic valves and pistons
The E3 CNC will, be taken out of production on May 26th from 900 til at least 1600.
Issues that will be investigated – and hopefully resolved: