Pressure Tank Test – Machine shutdown
All machines will be shutdown on July 2nd between 900 and 1000 in the morning.
All machines will be shutdown on July 2nd between 900 and 1000 in the morning.
A minor calibration and test of some of the axix on the table saw has been performed. A complete calibration has been ordered with Slejpner. Unfortunately….
Daniel has replaced a broken filterbag.
The Air Compressor is one of the most importent machines in the workshop.But as many other importent parts of this universe it is completely fortgotten.Every 6….
The band saw was cleaned, inspected and calibrated. Thanks to JC Steel
The E3 CNC will, be taken out of production on May 26th from 900 til at least 1600. Issues that will be investigated – and hopefully….
Daniel has built a new home for the Miter Saw, guiding a lot more dust into the extraction…
The E2 failed to pass the initial homing calibration today. It turned out that the proximity sensor used for the Y-axis calibration was reading wrong signals….