Author: Per Fogt
CNC E2 – fail and minor fire incident.
The small CNC – E2 – has been involved in a near-miss fire.A small fire, caused by unintentionally cutting deep into the spoilboard. Unintentional because the….
Jointer Planer Knives turned and calibrated.
The joint planer has been serviced. Knives turned and calibrated. Some found with minor damage to the new blades, that has now been fixed. Machine cleaned….
E3 – New Spoilboard
The SpoilBoard was replaced on Friday.Thomas gave a generous lesson in changing the Spoilboard.This will be followed up with another session at the end of the….
Thickness planer – overworked…
The Thickness Planer has been stressed recently. Overstressed.To a level where the internal gears and chain is suffering.Fine metal dust/scrapings have been located inside the machine.Members….
Visits to the workshop in week 44 and 45
Uge 44 Besøg af ConcitoFortrinsvis på Mezzanin dækket.Torsdag og fredag vil der være nogen aktivitet på træværkstedet. Uge 45 Besøg af FGUDer vil være undervisning og….
Extraction II blocked and cleared
The top of the bag-filter in extraction II was blocked – again.There has been a handful of blocks recently, all caused by rough cuttings of Oak….
CNC E2 – SpoilBoard Planed
SpoilBoard Planed -0.5
Thickness Planer – Service
Full service, Planer is running as well as possible.







